This browser does not support the video element.
This dredging grab can suit for the port and river channel dredging, can take stone , mud and sands from bottom of port and river below 20 meters water depth.
the taking material :1.5-3.5t/m3
the grab volume from 2m3-30m3.
the SWL Loading of grab :20 tons- 370 tons.
+86 139-6265-5806
+86 189-1780-5198
Home Production About Us Service Case news Support Contact us